Technicolor | Paramount | Exterior Design
       
     
EXTERIOR 6.jpg
       
     
DSC01085.jpg
       
     
EXTERIOR 4.jpg
       
     
EXTERIOR EVENING 2.jpg
       
     
0824_paramountpostproduction4.jpg
       
     
EXTERIOR EVENING 5.jpg
       
     
EXTERIOR EVENING 3.jpg
       
     
paramount-soundup-3[1].jpg
       
     
paramount-soundup-2[1].jpg
       
     
Technicolor | Paramount | Exterior Design
       
     
Technicolor | Paramount | Exterior Design

Developed in collaboration with Technicolor, this first-of-its-kind, LEED-certified audio post production building is the first built project of the recently approved Paramount Studios Master Plan.  The new three-story, 85,000 sq ft structure occupies a long, narrow site on Paramount’s dense Hollywood backlot.  Designed to be Los Angeles’ preeminent, state-of-the-art sound facility, it features two world-class theatrical mixing stages, as well as two smaller audio predubbing and QC screening stages.  Paired ADR and broadcast mix stages fill the balance of the ground floor.  Second floor broadcast mix stages and an animation ADR stage are complemented by a variety of small sound design and edit bays.  A centrally-located machine room serves the operation.  Management teams occupy offices on a third floor that is shared with new picture edit suites for Paramount.

Mechanical units are served by a new central chiller plant, with several units providing HVAC to adjacent existing stages.   An efficient lighting design mixes compact fluorescent and LED fixtures. A new streetscape design adds plant materials and controls site runoff.

EXTERIOR 6.jpg
       
     
DSC01085.jpg
       
     
EXTERIOR 4.jpg
       
     
EXTERIOR EVENING 2.jpg
       
     
0824_paramountpostproduction4.jpg
       
     
EXTERIOR EVENING 5.jpg
       
     
EXTERIOR EVENING 3.jpg
       
     
paramount-soundup-3[1].jpg
       
     
paramount-soundup-2[1].jpg